Germans Aymar i Puig Residence
Project engineering
Executive project for a newly built elderly care residence located in Alella, with capacity for 47 residents, 9 single rooms and 19 double rooms.
The installations for cold and hot water, aerothermal systems, HVAC and heating, ventilation, fire protection, drainage, electricity, lighting, security, and low-voltage systems are described and justified.
Legal Engineering
Preparation of the Fire Protection (PCI) Compliance Annex to obtain the favourable report from the Fire Department, legal supervision during construction, and legalization of the activity.
The Self-Protection Plan was also drafted and approved, and its implementation was carried out.
Portfoli Categoria


