Pere Virgili Healthcare Park
Project engineering
We carried out the project design and site supervision of the installations for the interior refurbishment and extension of several buildings at Parc Sanitari Pere Virgili:
- Montseny Building
- Pedraforca Building
- Xaloc-Llevant Building
- Gregal Building (with BIM modelling)
We also developed improvement and optimization projects for the existing thermal production systems in the Tramuntana, Llevant and Xaloc buildings, as well as for the HVAC and electrical installations of the Park’s Data Processing Centre (CPD), considering all supply security criteria and redundancy of thermal and electrical equipment. In the Tramuntana building, we also replaced the chiller with a higher-performance and more efficient unit.
Extended basic project for the incorporation of photovoltaic solar energy on various building roofs and pergolas, with a total of 450 kWp dedicated to self-consumption of the facility.
Surgical Area
Refurbishment and upgrading of the operating theatres of the ophthalmology unit located in the Gregal/Tramuntana building of the healthcare park. The refurbishment includes the installation of HVAC treatment and distribution systems for the operating theatres, as well as the interior adaptation of the theatres and the clean zone spaces.
Technical consulting
Preparation of a Master Plan for tenders related to the outsourcing of various services necessary for hospital operation and monitoring of the status of the tenders.
Advisory services and/or drafting of technical specifications, administrative clauses, evaluation criteria and penalties in case of service failure, for the tendering of various works and/or services required for the operation of the Parc Sanitari Pere Virgili (PSPV) buildings. Some of the specifications include: laundry service, supply of beds and armchairs, comprehensive maintenance service for installations, refurbishment of the heating and cooling production plant of Llevant and Xaloc, security services and vertical transportation equipment.
Preliminary project for the modification of the surgical area of the Tramuntana building. The study analyses the existing infrastructures and provides the necessary actions to achieve ISO 6 air quality level in the operating theatres. Additionally, the new installation will reduce operating costs, improve maintenance and reduce the risk of contamination in clean areas.
Legal engineering
We carried out the legal audit and master plan for the legalization of the Parc Sanitari’s activity.
Energy efficiency
Roadmap to transform PSPV into a Local Energy Community, enabling the centralization of efforts aimed at incorporating tools such as energy self-consumption, mainly photovoltaic technology, as well as energy management or building energy refurbishment tools, among others.
Furthermore, through the execution of the project, the aim is to give visibility to energy management actions in a complex serving a population area of more than 100,000 people, and to facilitate access to different funding lines that will enable the improvement of existing installations through enhancement actions and increased energy efficiency.


