Razzmatazz
Project engineering
- Executive Project of Works and Installations for the connection to the Districlima network of the Razzmatazz Building and the air conditioning of the entire room 1.
- A new diffusion system has been installed in room 1 and the old refrigerators have also been replaced by a substation connected to the Districlima network. The power supply for the two installed air conditioners of 35,000 m3/h is supplied by two batteries with suction recovery. On the one hand, the cold battery, with available power of 300kW, and on the other, a heat battery of 150kW. All the elements are integrated into the roof of the building.