Betània Patmos School


  • Client: BetàniaPatmos Private Foundation
  • Architecture: Capilla Mónaco Arquitectes
  • Period: 2014 – 2016
  • Built area: 12.115 m²
  • Energy savings: 208,000 kWh/year; 69 Tn CO₂/year

Project Engineering

Execution of the interior installations, outdoor multi-sports court and underground parking of the new BetàniaPatmos nursery school. ARCbcn has been responsible for carrying out the design, dimensioning and works relating to the electrical installations, earth network, lightning rods, air conditioning with aerothermal and condensing boilers, ventilation with heat recovery, extraction, plumbing, sanitation, use of rainwater and grey water, fire protection, weak signals and protection/security.

Technical Consulting

The school’s PAU has also been approved.

Legal Engineering

Legal audit and adaptation project of all campus facilities (Primary, Secondary, High School, Dining Room-Swimming Pool, Administration) of the BetàniaPatmos School.

Environmental license for all buildings on campus, including the Kindergarten building and the technical legalizations of this building.

Sustainable Architecture

The children’s building has been awarded LEED GOLD certification for New Construction .